wahl Posted December 29, 2010 Report Share Posted December 29, 2010 Bill The motorway along the side of the potholed ridden Blackbrook Avenue is the result of some councillor instructing some useless council officer to put a walk way there to allow people to walk to the station. The money came courtesy of the last government ( remember brown and his cronies spending spending spending?) and is an addition to the tarmac in Great Sankey. ( I believe it can be used in an emergency when the potholes in the actual road become large ) Who is going to walk or even cycle is as yet unknown, but must be in the thousands if the tarmac is to be cost justified oops sorry I forgot the tarmac replaced the shrubbery and greenery and is not really politically correct. This is another example of a useless council refusing to manage and monitor the working of a totally useless executive. By the way the execuuives who are " only doing their job" are installing a pedestrian controlled traffic light crosssing across Birchwood Way to allow the thousands of walkers and cyclists to cause some more traffic jams. Quote Link to comment Share on other sites More sharing options...
Dizzy Posted December 29, 2010 Report Share Posted December 29, 2010 Cyclists and pedestrians... queue RK and other supposters... According to the 'qualitative research' carried out by the Department of Transport (DfT) published Sept 2010 regarding cyclists and other road users...... 'something' was found http://www.dft.gov.uk/pgr/roadsafety/research/rsrr/theme1/researchreport/ Quote Link to comment Share on other sites More sharing options...
wahl Posted December 30, 2010 Report Share Posted December 30, 2010 well, Dizzy I see you have found another government department that writes useless reports and draws wonderful conclusions that do little to enhance the reputation of cyclists. I Quote Link to comment Share on other sites More sharing options...
Dizzy Posted December 30, 2010 Report Share Posted December 30, 2010 Came across it quite by accident Wahl... don't blame me, I didn't write it or contribute to the so called 'qualitative research' Quote Link to comment Share on other sites More sharing options...
observer Posted January 11, 2011 Author Report Share Posted January 11, 2011 Back to Padgate Lane - Gorsey Lane jct: they've started back after the Xmas hols, and just to let everyone know it, they put tempory traffic lights on, but the sequence is so slow, that traffic is backing up for 300 yds. All this, to put in about 6 dropped curbs for disabled use - if this gang had had the contract for Hadrian's Wall - they'd still be building it. Quote Link to comment Share on other sites More sharing options...
Peter T Posted January 11, 2011 Report Share Posted January 11, 2011 if this gang had had the contract for Hadrian's Wall - they'd still be building it. Thanks obs for the chuckle. I like it. Brightened my day up.lol Quote Link to comment Share on other sites More sharing options...
observer Posted January 12, 2011 Author Report Share Posted January 12, 2011 Well they've disappeared completely now, taking their barriers etc with them; but leaving the pelican lights to be completed - perhaps they've been given the contract for reconstruction works in Haiti?! Quote Link to comment Share on other sites More sharing options...
Bill Posted January 12, 2011 Report Share Posted January 12, 2011 Just when you thought it was safe to go back in the water, they?re at it again on the next set of lights down at the junction of Holes Lane and the works expected to last 12 weeks (WHY!) There?s going to be some big problems here because of the dual carriageway. It?s single lane through the lights, which means you need to get in the outside lane on the dual carriageway then cut in at the last second. Oddly enough, the people sitting going nowhere on the inside lane seem to get pretty hot under the collars about this, wonder why? Somehow think a few more cones are needed. I?ve just queued for flippin ages so I don?t know what this is going to be like at rush hour. Bill Quote Link to comment Share on other sites More sharing options...
observer Posted January 12, 2011 Author Report Share Posted January 12, 2011 Must be the same gang?! Quote Link to comment Share on other sites More sharing options...
observer Posted January 14, 2011 Author Report Share Posted January 14, 2011 Well, they were back again today: to lay a patch of road surface; this required the temp traffic lights again, and the inevitable traffic queue. Is this what they call "piece work"? A piece here one day, and a piece there the other - meanwhile no peace for road users. Quote Link to comment Share on other sites More sharing options...
observer Posted January 17, 2011 Author Report Share Posted January 17, 2011 They're back AGAIN, another bit of road patching and some cabling - talk about making a mountain out of a mole hill. Quote Link to comment Share on other sites More sharing options...
Peter T Posted January 17, 2011 Report Share Posted January 17, 2011 Get onto the council, or can't you? Quote Link to comment Share on other sites More sharing options...
Bazj Posted January 17, 2011 Report Share Posted January 17, 2011 Get onto the council, or can't you? I thought he did?? Quote Link to comment Share on other sites More sharing options...
observer Posted January 17, 2011 Author Report Share Posted January 17, 2011 Then it might have got sorted! Quote Link to comment Share on other sites More sharing options...
Dizzy Posted January 18, 2011 Report Share Posted January 18, 2011 Go and speak to the workmen Obs and ask them what on earth is going on..... then you can hound the council Quote Link to comment Share on other sites More sharing options...
wahl Posted January 19, 2011 Report Share Posted January 19, 2011 the council do not care a damn about what their staff do. Quote Link to comment Share on other sites More sharing options...
Dizzy Posted January 19, 2011 Report Share Posted January 19, 2011 ahh but the workers are often willing to dish the dirt on their employees when asked Quote Link to comment Share on other sites More sharing options...
observer Posted January 19, 2011 Author Report Share Posted January 19, 2011 Presume these are contractors - anyway, they've gone away for now, leaving some cables sticking out of the ground - so I guess they'll be back. Quote Link to comment Share on other sites More sharing options...
Dizzy Posted January 19, 2011 Report Share Posted January 19, 2011 Go and snip them off Obs... that would confuse them Quote Link to comment Share on other sites More sharing options...
wahl Posted January 19, 2011 Report Share Posted January 19, 2011 It lasts twelve weeks because the "workers" work for four hours with two hours for tea breaks, and the temporary light erectors work for two hours at 0900 to set up the traffic jams, and at 1500 for ten minutes to remove the lights. In between the contractors dig holes, fill them in and refill them when the traffic dislodges the crappy work they have done. Lastly they will have to reschedule the lights to allow all the thousands of cyclists and pedestrians hours to cross the road and also to introduce the lighting into the useless electronic traffic jamming system they use to create traffic jams. Meanwhile the wbc managers sit in their ivory tower and dream where they can next cause trouble and waste money on irrelevant schemes that help no one apart from the paint manufacturers. Quote Link to comment Share on other sites More sharing options...
observer Posted January 20, 2011 Author Report Share Posted January 20, 2011 Two blokes were back today, messing with the cables; thankfully they didn't interfere with the traffic - that (as Wahl rightly says) will probably happen when the lights are operational! Quote Link to comment Share on other sites More sharing options...
wahl Posted January 25, 2011 Report Share Posted January 25, 2011 Hadrian's people are back at Gorsey Lane, causing huge traffic jame whilst they put another brick inplace. Quote Link to comment Share on other sites More sharing options...
observer Posted January 25, 2011 Author Report Share Posted January 25, 2011 I know. Quote Link to comment Share on other sites More sharing options...
observer Posted March 24, 2011 Author Report Share Posted March 24, 2011 Well this junction is finally up and running, and with the exception of some cones surrounding a pot hole - working. Or is it? They've put one huge pedestrian phase on the lights, so now we have a queue of cars in all directions. Quote Link to comment Share on other sites More sharing options...