Jump to content

New Mersey Gateway Bridge


Recommended Posts

From the Mersey gateway Construction forum on facebook alg I believe (just browsing). Seems that it's the first bridge to be built to cross the Mersey in over 50 years. Strong enough for HGV's but only temporary in that it will eventually be knocked down.

  • Upvote 2
Link to post
Share on other sites

Me neither tod.

The temp bridge doesn't look strong or big enough to hold that huge crane, obviously it must be but not sure I'd like to be on it in one.

Must be a really strange and unnerving place to be working......

Link to post
Share on other sites

I saw those three trucks parked on Widnes Road opposit the power station late last night, next to the road side cafe..

Link to post
Share on other sites
  • 1 month later...

Wow that's huge, great photo.  Probably a really silly question but why to they need one that high as everything looks like its at a low level and there's not much of an arm on it either so what's the point ?

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...